Rounding the Corners — Week 10

A couple weeks of rain have made finishing the exterior slate difficult.  It’s almost done, though, and the rest of the exterior is almost ready for its finishing touches.  The large beige rectangle to the left of the entry vestibule is the future spot of a graphic billboard.  Our finishing contractors, KGI, will truck the billboard in from Ohio later next week along with the awnings, exterior lights, and Punk’s Backyard Grill sign.

dec16-panoramic-exterior1

The patio railing was also partially installed this week.

dec16-patio

Inside, the interior walls are almost complete.  The contractors installed the wood siding down the restroom corridor.

dec16-entrance-to-hall

Here’s a view down the restroom corridor midway through floor installation.  The windows on the left look into the kitchen prep and production areas.  The design was based on the idea of looking into a house from the backyard — I think it’s coming together.

dec-16-hallway

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s