Punk’s Backyard Grill came a long way over the past two weeks.

The exterior still looks rough, but the progress is visible.  The floor-to-ceiling glass windows were finally installed last week — evidently the delay was caused by a troublesome glass tempering machine.

The application of the slate tiles is almost complete.  It’s a bit of a slow process since each tile must be applied individually, and the outside temperature can’t be too cold or the tiles won’t stick.  Each slate tile has a slightly different color, so they create an attractive textured appearance when they’re all together.

dec1-construction-001

Here’s a closer-up picture of the applied slate tiles on the far right corner of the restaurant.

dec1-construction-019

Inside, the colors and textures are starting to appear.  The dining area walls are finished with a brick pattern.  The picture below shows the design trick — the thin “bricks” are applied directly to the drywall.

dec1-construction-016

And here is the detail of the brick design.

dec1-construction-009

The ceiling was painted sky blue.  The color really lightens up the place, but the ceiling won’t appear so exposed once the final design pieces are installed.

dec1-construction-012

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s