Tiles, Walls, and Frames — Week 6

The second half of last week was rainy and wet, so plans to install the slate siding on the building were delayed. But framing for the floor to ceiling windows and the entry vestibule continued.

construction-1114-012

Out the rain, the contractors made a lot of progress inside — they laid the tiles for the kitchen floor and the walls of the bathrooms, and they installed the walls.  The walls in both pictures are “green board” — moisture resistant drywall that happens to be green.  Here are some pictures of the tiles and walls:

construction-1114-003 construction-1114-019

*     *     *

We’re not the only ones ready for Punk’s to open!  Inside Westfield Annapolis there are some great new signs showing the near arrival of Punk’s Backyard Grill.  I found both of these signs in the West Atrium near Macy’s.

construction-1114-014 construction-1114-024

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s