Punk’s Backyard Grill came a long way over the past two weeks.
The exterior still looks rough, but the progress is visible. The floor-to-ceiling glass windows were finally installed last week — evidently the delay was caused by a troublesome glass tempering machine.
The application of the slate tiles is almost complete. It’s a bit of a slow process since each tile must be applied individually, and the outside temperature can’t be too cold or the tiles won’t stick. Each slate tile has a slightly different color, so they create an attractive textured appearance when they’re all together. Continue reading