January 2009


KGI came last weekend and finished their work on the awnings, grill, and exterior sign.  The storefront is looking great since the cleaning crew washed all the windows.

p1010203-stitch

Just a few more details and the dining room will be ready for guests.  The crew from Jan Ferguson Interior Plantscaping came yesterday to install our ficus trees, window boxes, and potted plants.

1-19-09-interior-stitch

We’re almost ready to fire up the grill!

1-19-09-9

It’s fast and furious these days as we get ready to open the doors.  Here’s a picture of the exterior taken last night.  There’s still a bit to go — KGI returns this week to illuminate the “Punk’s Backyard Grill” sign and finish installing more awnings.

Consider this picture an appetizer — I’ll post interior pictures next.

1-13-091

After weeks of anticipation, the KGI team arrived in Annapolis last Friday afternoon.  They worked through the weekend to install the major decorative elements in the restaurant.

Here’s a picture of the dining area with the new railings (picket fence on the right, wrought iron on the left) and giant trellis hanging from the ceiling.  Once we put the tables and chairs together this weekend, the dining area will be nearly complete.

construction-17-001

My favorite part of the restaurant so far is the order counter area — I think the backyard-iness is really coming together in this space.  The picture below shows the striped awnings above the windows, the trellis above the order counter, the “pie window,” the lantern lights, and the garden hose-trimmed menu boards.

construction-17-002

While I have been informed that bathroom pictures are not interesting, I’m posting one anyway.  There is still some work to be done (like installing a faucet), but I think it’s looking good — the tiling, lantern lights, and lattice mirror repeat the design elements of the main areas.

construction-17-014

KGI goes to work on the exterior tomorrow, so we’ll have some good pictures by the end of the weekend.

I’ll blame the delay in posts on holiday events, because there was no shortage of progress on the site over the past couple weeks.  BGC is finishing up — laying the final floor tiles, applying the last pieces of exterior slate, installing restroom fixtures, and painting the patio railing.

p1010075-stitch

Meanwhile, the Gill Group has been delivering and installing pieces of kitchen equipment.  Here’s a picture of the “Cold Prep” area in the kitchen.  The window on the left looks out into the back corridor, so guests can peek inside the kitchen.

p1010085

The focal point of the restaurant is the 60″ grill that faces the dining area.  The grill itself will be part of a larger installation of hooding and custom fabricated stainless steel pieces.  The picture below shows the giant stainless steel hood sitting on the floor waiting to be hung above the grill.

p1010083

KGI, the “finishing” contractors arrive on Friday to install the final decorative elements.  They have spent the past few months building our cabinetry, exterior signage, awnings, menu boards, and ceiling decor in their Ohio factory.  So they’ll load up an eighteen-wheeler and haul everything over to Annapolis to begin installation.  Since everything is already built, the transformation over the next three days should be remarkable.